濟南通風管道看圖技巧
來源:http://www.xyphw.com 日期:2025-04-02 發布人:創始人
一、圖紙基礎信息識別
1、 Identification of basic information on drawings
比例與圖例
Proportion and legend
濟南地區常用 1:100 或 1:200 比例,注意風管尺寸標注單位(mm 或 m)
The commonly used scale in Jinan area is 1:100 or 1:200, pay attention to the unit of air duct size annotation (mm or m)
重點識別本地常用符號:
Key identification of commonly used local symbols:
? 排煙風管(紅色虛線)
Smoke exhaust duct (red dashed line)
? 新風管(藍色實線)
Fresh air duct (solid blue line)
? 消聲器(濟南地鐵項目常用阻抗復合式符號)
Silencer (commonly used impedance composite symbol for Jinan Metro project)
標高系統
Elevation system
濟南地區地下室層高普遍≥3.5m,注意風管底標高標注(如 F+2.8m 表示距地 2.8 米)
The basement floor height in Jinan area is generally ≥ 3.5m. Pay attention to the elevation marking of the air duct bottom (such as F+2.8m indicating a distance of 2.8 meters from the ground)
結合《山東省建筑防煙排煙系統技術標準》,排煙風管距可燃物間距≥150mm
According to the Technical Standards for Building Smoke Control and Exhaust Systems in Shandong Province, the distance between the exhaust duct and combustible materials should be ≥ 150mm
二、系統布局分析技巧
2、 System layout analysis skills
氣流組織路徑
Airflow organization path
濟南夏季主導風向東南風,進風口應避開污染源(如工業區、交通干道)
The dominant wind direction in Jinan during summer is southeast, and the air inlet should avoid pollution sources such as industrial areas and traffic arteries
某商業綜合體項目案例:新風管避開地下車庫排風井,采用屋頂高位進風(高度≥5m)
Case study of a commercial complex project: The new air duct avoids the exhaust shaft of the underground garage and adopts high-level air intake on the roof (height ≥ 5m)
管道坡度設計
Pipeline slope design
冷凝水排水管坡度≥3‰(GB 50738-2011),濟南濕度大需特別注意
The slope of the condensate drainage pipe is ≥ 3 ‰ (GB 50738-2011), and special attention should be paid to the high humidity in Jinan
人防地下室風管坡度需結合排水地漏位置,坡度方向箭頭指向排水點
The slope of the air duct in the civil air defense basement should be combined with the position of the drainage floor drain, and the slope direction arrow should point to the drainage point
三、關鍵節點識圖要點
3、 Key Points for Key Node Mapping
風管與設備連接
Air duct and equipment connection
風機進出口需設置軟連接(長度 150-300mm),濟南某醫院項目采用硅鈦合金軟接
Soft connections (length 150-300mm) are required for the inlet and outlet of the fan. A hospital project in Jinan uses silicon titanium alloy soft connections
防火閥安裝位置:距墻表面≤200mm(GB 50016-2014),需與圖紙標注一致
Installation position of fire damper: ≤ 200mm from the wall surface (GB 50016-2014), consistent with the drawing markings

變徑與彎頭處理
Variable diameter and elbow treatment
矩形風管長邊>630mm 時需設置導流葉片,某地鐵車站彎頭采用 S 型導流板
When the length of the rectangular air duct is greater than 630mm, guide vanes need to be installed, and an S-shaped guide plate is used for the elbow of a subway station
濟南西站風管變徑段長度按 1:4-1:6 比例設計,減少局部阻力損失
The length of the variable diameter section of the air duct at Jinan West Station is designed in a ratio of 1:4-1:6 to reduce local resistance losses
四、材料與保溫要求
4、 Material and insulation requirements
風管材質識別
Identification of duct material
地下車庫排煙風管需采用厚度≥1.2mm 鍍鋅鋼板(濟南消防驗收強制要求)
The smoke exhaust duct of the underground garage must be made of galvanized steel plate with a thickness of ≥ 1.2mm (mandatory requirement for Jinan fire inspection)
人防工程優先選用 3mm 厚鋼板風管,配合 L50*5 角鋼法蘭
Priority should be given to using 3mm thick steel plate air ducts for civil air defense projects, in conjunction with L50 * 5 angle steel flanges
保溫層標注
Insulation layer labeling
空調風管保溫層厚度≥30mm(橡塑材料,導熱系數≤0.034W/(m?K))
The insulation layer thickness of the air conditioning duct is ≥ 30mm (made of rubber material, with a thermal conductivity coefficient of ≤ 0.034W/(m? K))
濟南地區需注意冷凝控制,保溫層外需設置防潮層(鋁箔貼面)
Attention should be paid to condensation control in Jinan area, and a moisture-proof layer (aluminum foil veneer) should be installed outside the insulation layer
五、與其他專業協同要點
5、 Key points for collaboration with other professions
管線綜合原則
Comprehensive principle of pipeline
風管避讓原則:有壓管讓無壓管,小管線讓大管線
Principle of avoiding air ducts: pressure pipes should be replaced by non pressure pipes, and small pipes should be replaced by large pipelines
某綜合體項目實例:風管與噴淋管交叉時,風管上翻 300mm 避開噴淋頭
Example of a certain integrated project: When the air duct intersects with the sprinkler pipe, the air duct is flipped up 300mm to avoid the sprinkler head
預留孔洞標注
Reserved hole marking
穿墻套管尺寸需比風管大 100mm,濟南地區預留孔洞需考慮保溫層厚度
The size of the through wall sleeve should be 100mm larger than the air duct, and the reserved holes in Jinan area need to consider the thickness of the insulation layer
人防套管需標注密閉肋位置(距墻表面 50mm)
The position of the sealing rib should be marked on the civil air defense casing (50mm away from the wall surface)
本文由濟南通風管道友情奉獻.更多有關的知識請點擊: http://www.xyphw.com我們將會對您提出的疑問進行詳細的解答,歡迎您登錄網站留言.
This article is a friendly contribution from Jinan ventilation ducts For more information, please click: http://www.xyphw.com We will provide detailed answers to your questions. You are welcome to log in to our website and leave a message
上一篇:為什么使用山東通風管道本站圖片均由網站所有方提供,部分圖片來源于網絡,如有任何疑問請及時與我們聯系,未經溝通本站不承擔相關法律責任!
少妇无码在线| 暗交小拗女一区2区三区| 亚洲无码在线观看视频| ,国产乱人伦真实精品视频| 久久的入| 在线中文字幕| 久久婷婷影院| 欧美性生交XXXXX久久久| 老熟妇乱子伦| 久草视频网站| 蜜桃AV无码一区二区三区| www.射| 人人草在线视频| 强行糟蹋人妻HD中文字幕| 亚洲熟女乱伦| 攵女Yin乱片国产| 91精品久久日日躁夜夜躁欧美| 蜜桃视频一区二区| 色呦呦在线| 人妻丰满熟妇av无码久久洗澡| 人妻av鲁丝一区二区三区| 色噜噜狠狠一区二区三区| 久久精品五月天| av毛片久久久久午夜福利HD | 国产成人强伦免费视频网站| 久久这里有精品| 9999精品视频| 精品久久久一区二区| 久久久久久久久久久久久久久久久久 | 少妇粉嫩小泬喷水视频www| 北岛玲视频在线| 久久久久无码国产精品不卡| 韩国伦理在线| 人人射人人操| 丁香婷婷五月| 婷婷成人AV天堂草莓| 婷婷久久久| 人妻无码成人一区二区| 一级免费看| 国产91精品看黄网站在线观看| 久操资源|